Curved canopy soffit at Putney High School's Performing Arts Centre, seen from below, with vertical timber battens above the roof edge

Education

Putney High SchoolPerforming Arts Centre refurbishmentPutney · London SW15

The team behind Dmitro Development worked under ITC Concepts Ltd on the 2015 refurbishment of Putney High School's Performing Arts Centre for the Girls' Day School Trust.

01 · The Performing Arts Centre's curved entrance canopy, seen from below.

At a glance

Package
Performing Arts Centre refurbishment
Role
Delivery-stage subcontract involvement
Location
Putney · London SW15
Main contractor
ITC Concepts Ltd
Client
Girls' Day School Trust

The team behind Dmitro Development worked under ITC Concepts Ltd during the Performing Arts Centre's 2015 refurbishment for the Girls' Day School Trust. Retention invoices from August and September 2015 record the subcontract involvement. The specific package is not identified in the surviving record.

Copper-clad entrance porch and lift lobby at Putney High School, with automatic glazed doors

02

The copper-clad entrance porch and lift lobby.

The copper-clad Performing Arts Centre extension beside Putney High School's original brick building

03

The extension beside the original school building.

Grey panelled soffit meeting a copper-capped parapet along an elevated walkway at Putney High School

04

Soffit and parapet along the elevated walkway.

Corner of the curved canopy soffit at Putney High School, with timber battens and a rainwater outlet

05

The canopy's corner, where the curved roof meets the wall.

The wider scheme

A 46-week refurbishment for the Girls' Day School Trust.

Putney High School's Performing Arts Centre was delivered as a 46-week refurbishment for the Girls' Day School Trust, designed by architect Shepheard Epstein Hunter, with ITC Concepts Ltd as main contractor. The wider delivery team also included Edge Structures, Low and Low, Michael Popper Associates and Acoustic GRG/RPG Europe.

The wider centre, including its steel frame, structural envelope, copper cladding, oak joinery and acoustic fit-out, was operational by December 2015. None of these systems is attributable to Dmitro.

The team's own role is recorded only as delivery-stage subcontract commercial involvement, evidenced by retention invoices dated 24 August and 30 September 2015. The surviving record does not establish which specific package the team delivered within this wider scheme.

Design visualisations

Two architectural renderings from the project record, shown here as design context rather than site photography: an aerial cutaway of the whole scheme and an interior view of the auditorium as designed.

Design visualisation of Putney High School's Performing Arts Centre, an aerial cutaway showing the auditorium within the surrounding school buildings

06

An aerial cutaway visualisation showing the auditorium within the wider scheme, credited to Edge Structures.
Design visualisation of the auditorium interior at Putney High School's Performing Arts Centre, showing raked seating and a stage

07

A visualisation of the auditorium interior as designed, raked seating facing the stage.
The completed auditorium interior at Putney High School's Performing Arts Centre, with tiered seating on purple carpet

08

The completed auditorium, its tiered seating stepped down over purple carpet.

A 46-week refurbishment, completed for Putney High School.

Putney, London SW15

Architect
Shepheard Epstein Hunter
Wider delivery team
Edge Structures, Low and Low, Michael Popper Associates, Acoustic GRG/RPG Europe

Photography: Edge Structures